Simatic Component based Automation Commissioning Systems

pdf
Số trang Simatic Component based Automation Commissioning Systems 198 Cỡ tệp Simatic Component based Automation Commissioning Systems 3 MB Lượt tải Simatic Component based Automation Commissioning Systems 0 Lượt đọc Simatic Component based Automation Commissioning Systems 0
Đánh giá Simatic Component based Automation Commissioning Systems
4.8 ( 20 lượt)
Nhấn vào bên dưới để tải tài liệu
Đang xem trước 10 trên tổng 198 trang, để tải xuống xem đầy đủ hãy nhấn vào bên trên
Chủ đề liên quan

Nội dung

s Preface, Contents SIMATIC Component based Automation Commissioning Systems Tutorial Edition 12/2003 A5E00248818-01 Tutorial - Introduction 1 Part 1: Creating PROFInet Components 2 Part 2: Commissioning the System 3 Appendix 4 Index Safety Guidelines This manual contains notices intended to ensure personal safety, as well as to protect the products and connected equipment against damage. These notices are highlighted by the symbols shown below and graded according to severity by the following texts: ! ! ! Danger indicates that death, severe personal injury or substantial property damage will result if proper precautions are not taken. Warning indicates that death, severe personal injury or substantial property damage can result if proper precautions are not taken. Caution indicates that minor personal injury can result if proper precautions are not taken. Caution indicates that property damage can result if proper precautions are not taken. Notice draws your attention to particularly important information on the product, handling the product, or to a particular part of the documentation. Qualified Personnel Only qualified personnel should be allowed to install and work on this equipment. Qualified persons are defined as persons who are authorized to commission, to ground and to tag circuits, equipment, and systems in accordance with established safety practices and standards. Correct Usage Note the following: ! Warning This device and its components may only be used for the applications described in the catalog or the technical description, and only in connection with devices or components from other manufacturers which have been approved or recommended by Siemens. This product can only function correctly and safely if it is transported, stored, set up, and installed correctly, and operated and maintained as recommended. Trademarks SIMATIC®, SIMATIC HMI® and SIMATIC NET® are registered trademarks of SIEMENS AG. Third parties using for their own purposes any other names in this document which refer to trademarks might infringe upon the rights of the trademark owners. Copyright © Siemens AG 2003 All rights reserved Disclaimer of Liability The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders will be liable for damages. All rights, including rights created by patent grant or registration of a utility model or design, are reserved. We have checked the contents of this manual for agreement with the hardware and software described. Since deviations cannot be precluded entirely, we cannot guarantee full agreement. However, the data in this manual are reviewed regularly and any necessary corrections included in subsequent editions. Suggestions for improvement are welcomed. Siemens AG Bereich Automation and Drives Geschaeftsgebiet Industrial Automation Systems Postfach 4848, D- 90327 Nuernberg ©Siemens AG 2003 Technical data subject to change. Siemens Aktiengesellschaft A5E00248818-01 Preface Goal of the manual This manual is designed to enable you to commission the sample plant described. It is directed towards persons who work in the field of configuration, commissioning and servicing automation systems. Required basic knowledge You are required have a general knwowledge of automation technology as well as a broad knowledge of the SIMATIC devices used. In addition, you are required to have a good working knowledge of computers or other tools similar to the PC (e. g. programming devices) under the operating systems Windows 2000 or XP. Since the use of SIMATIC iMap with SIMATIC devices is based on the STEP 7 basic software you have to know how to use it. You can learn how to use this software in the manual "Programming with STEP 7". Validity of the manual This manual is valid for the software package SIMATIC iMap V2.0. Changes compared to the previous version Compared to the previous version, the following topics have been added to the manual compared: • Creating PROFInet components for CPU 317-2 PN/DP and CPU 314C-2 DP. • Configuring and commissioning a plant with CPU 317-2 PN/DP and CPU 314C-2 DP in SIMATIC iMap. Component based Automation, Commissioning Systems A5E00248818-01 iii Preface Your guide through the manual The tutorial contains • a description of the entire plant, • instructions on creating PROFInet components in part 1 and • instructions on commissioning the system in part 2. The instructions on commissioning the individual subplants contain all the necessary procedures. Therefore, some descriptions occur more than once, for example, "Creating a new project in SIMATIC iMap" or "Setting the PG/PC Interface". Place of the manual in the information environment This manual is part of the documentation package on Component based Automation und SIMATIC iMap. The documentation is supplied with the software and includes the electronic manuals in PDF format: • Configuring plants with SIMATIC iMap • Getting Started with SIMATIC iMap • Commissioning Systems - the updated manual • Creating PROFInet Components In addition, the entire documentation is available as an HTML Basic Help. Conventions • Menu commands are written in bold letters, for example: Project> Save. • Placeholders are set in angle brackets, for example . Further support Please contact your local SIEMENS partner if you have any further queries on the products described in this manual. http://www.siemens.com/automation/partner http://www.ad.siemens.de/cba/ Training centers To give you an easy start with SIMATIC iMap, we offer corresponding courses. Please contact your local training center or the central training center in D 90327 Nuremberg. iv Phone: +49 (911) 895-3200 Internet: http://www.sitrain.com Component based Automation, Commissioning Systems A5E00248818-01 Preface A&D Technical Support Open round the clock, worldwide: Nuremberg Beijing Johnson City World-wide (Nuremberg) Technical Support Local time: 0:00 to 24:00 / 365 days Phone: +49 (180) 5050-222 Fax: +49 (180) 5050-223 EMail: adsupport@ siemens.com GMT: +1:00 Europe / Africa (Nuremberg) United States (Johnson City) Asia / Australia (Beijing) Authorization Technical Support and Authorization Technical Support and Authorization Local time: 8:00 to 17:00 Local time: 8:00 to 17:00 Local time: 8:00 to 17:00 Phone: +49 (180) 5050-222 Phone: Phone: Fax: +49 (180) 5050-223 +1-52520779 740 3699, Fax: Fax: +86 10 64 74 74 74 EMail: adsupport@ siemens.com EMail: E-Mail: adsupport.asia@ GMT: +1:00 GMT: +1 (423) 262 2522. simatic.hotline@ sea.siemens.com -5:00 +86 10 64 75 75 75 siemens.com GMT: +8:00 German and English spoken at the Technical Support and Authorization hotlines. Commissioning Component based Automation Systems A5E00248818-01 v Preface Service & Support on the Internet In addition to our documentation services, we also offer you our knowledge base on the Internet. http://www.siemens.com/automation/service&support Here, you will find: • the newsletter which constantly provides you with up-to-date information about your products. • your appropriate documentation via our Service & Support search engine • a forum for the exchange of information between users and specialists worldwide • your local Automation & Drives partner via our partner database. • information on repairs, replacement parts and on-site service. You will find more information under "Services“. vi Component based Automation, Commissioning Systems A5E00248818-01 Contents 1 Tutorial - Introduction.................................................................................................... 1-1 1.1 1.2 2 Part 1: Creating PROFInet Components...................................................................... 2-1 2.1 2.2 2.3 2.4 2.4.1 2.4.2 2.4.3 2.4.4 2.4.5 2.4.6 2.4.7 3 Overview........................................................................................................... 1-1 Description of the Complete Plant .................................................................... 1-2 Overview - Creating PROFInet Components ................................................... 2-1 Requirements - Creating PROFInet Components............................................ 2-2 Basic Procedure - Creating PROFInet Components........................................ 2-2 Creating PROFInet Components...................................................................... 2-3 Creating the PROFInet Component for CPU 317-2PN/DP .............................. 2-3 Creating the PROFInet Component for CPU 315-2DP .................................. 2-12 Creating the PROFInet Component for WinLC PN ........................................ 2-20 Creating the PROFInet Component for CPU 314C-2 DP............................... 2-28 Creating the PROFInet Component for ET 200S with IM 151/CPU............... 2-36 Creating the PROFInet Component for ET 200X with BM147/CPU .............. 2-44 Creating the PROFInet Component for ET 200M with IM 153-1.................... 2-52 Part 2: Commissioning the System.............................................................................. 3-1 3.1 3.2 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.3.6 3.3.7 3.4 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 3.4.6 3.4.7 3.5 3.5.1 3.5.2 3.5.3 3.5.4 3.5.5 3.5.6 3.5.7 3.6 Requirements - Commissioning the System .................................................... 3-1 Basic Procedure - Commissioning the System ................................................ 3-2 Machine 1 ......................................................................................................... 3-3 Machine 1, Processing: CPU 317-2 PN/DP with PROFIBUS-DP Slaves ........ 3-3 Step 1: Setting up the Hardware for Machine 1 ............................................... 3-5 Step 2: Assigning the Devices with Addresses the First Time ......................... 3-8 Step 2: Configuring Machine 1 with SIMATIC iMap ....................................... 3-17 Step 4: Checking the Required Settings on the Engineering Station for Machine 1 .................................................................................................. 3-26 Step 5: Commissioning Machine 1 ................................................................. 3-33 Step 6: Online Monitoring of Machine 1 ......................................................... 3-36 Machine 2 ....................................................................................................... 3-40 Machine 2, Scanning: IE/PB Link with PROFIBUS DP Slaves ...................... 3-40 Step 1: Setting up the Hardware for Machine 2 ............................................. 3-42 Step 2: Assigning the Devices with Addresses the First Time ....................... 3-45 Step 3: Configuring Machine 2 with SIMATIC iMap ....................................... 3-53 Step 4: Checking the Settings for Downloading and Online Monitoring on the Engineering Station ........................................................................................ 3-61 Step 5: Commissioning Machine 2 ................................................................. 3-68 Step 6: Online Monitoring of Machine 2 ......................................................... 3-70 Machine 3 ....................................................................................................... 3-75 Machine 3, Packaging: CPU 315 with CP 343-1 PN...................................... 3-75 Step 1: Setting up the Hardware of Machine 3............................................... 3-76 Step 2: Assigning the CP 343-1 PN an IP Address the First Time ................ 3-77 Step 3: Configuring Machine 3 with SIMATIC iMap ....................................... 3-80 Step 4: Checking the Required Settings on the Engineering Station for Machine 3 .................................................................................................. 3-87 Step 5: Commissioning Machine 3 ................................................................. 3-90 Step 6: Online Monitoring of Machine 3 ......................................................... 3-92 Plant Control ................................................................................................... 3-94 Component based Automation, Commissioning Systems A5E00248818-01 vii Contents 3.6.1 3.6.2 3.6.3 3.6.4 3.6.5 3.6.6 3.7 3.7.1 3.7.2 3.7.3 3.7.4 3.7.5 3.7.6 3.7.7 4 Plant Control with WinLC PN.......................................................................... 3-94 Step 1: Plant Control - Hardware Setup ......................................................... 3-95 Step 2: Configuring the Plant Control in SIMATIC iMap................................. 3-96 Step 3: Checking the Settings for Downloading and Online Monitoring......... 3-97 Step 4: Commissioning the Plant Control..................................................... 3-103 Step 5: Online Monitoring of the Plant Control ............................................. 3-104 Complete Plant ............................................................................................. 3-104 Setup of the Complete Plant......................................................................... 3-104 Step 1: Complete Plant - Hardware Setup ................................................... 3-105 Step 2: Configuring the Complete Plant ....................................................... 3-105 Step 3: Checking the Required Settings for Downloading and Online Monitoring on the Engineering Station ......................................................... 3-108 Step 4: Commissioning the Complete Plant ................................................. 3-115 Step 5: Online Monitoring the Complete Plant ............................................. 3-117 Analyzing with OPC ...................................................................................... 3-119 Appendix ......................................................................................................................... 4-1 4.1 4.2 Literature and Links .......................................................................................... 4-1 Tips for Operation ............................................................................................. 4-2 Index viii Component based Automation, Commissioning Systems A5E00248818-01 Tutorial - Introduction 1.1 1 Overview Aim of the tutorials for commissioning the system Numerous tasks are required to commission a plant with PROFInet and PROFIBUS devices in STEP 7, SIMATIC iMap and the plant itself. The aim of the tutorial is provide you with the skills to commission the example plant described here. Content of the tutorial The tutorial includes: • A description of a complete plant • Part 1: Instructions for creating PROFInet components and • Part 2: Instructions for commissioning the system Procedure With reference to the examples, you can work step by step through the process of commissioning a complex plant - from creation of the PROFInet components through to monitoring the configured plant online. If you already have off-the-shelf PROFInet components and simply want to interconnect them, you can start from Part 2: System commissioning. Component based Automation, Commissioning Systems A5E00248818-01 1-1 Tutorial - Introduction 1.2 Description of the Complete Plant The complete plant consists of three machines and a central plant control system. Each machine includes at least one PROFInet device with an Ethernet connector. When the PROFInet device is a PROFIBUS master, the machine may also contain a PROFIBUS device. Configuration of the plant Plant Control WinLC PN SIMATIC iMap Engineering PC Industrial Ethernet Machine 1 Processing Coordinator CPU 317-2 PN/DP PROFIBUS 1 Processing CPU 314C-2 DP Measuring ET 200M Machine 2 Scanning IE/PB Link PROFIBUS 2 Conveyor ET 200X Packaging CPU 315-2 DP + CP 343-1 PN Scan ET 200S Machine 3 Packaging Figure 1-1 Complete plant 1-2 Component based Automation, Commissioning Systems A5E00248818-01
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.